Free Contractor Bid Comparison Worksheet

Use this free contractor bid comparison worksheet to compare three written quotes side by side. Print it or save it as a PDF from your browser; no signup is needed.

A lower total can hide a different scope. Give each bidder the same plans and project description, then record what is included, excluded, or still unknown. This worksheet helps you prepare questions; it does not rate or endorse a contractor.

Already have quotes? Compare your entered costs →

Compare the Same Job

  1. Verify each business. Follow our license verification guide and record when you checked CSLB.
  2. Ask for itemized written bids. Separate fixed prices from allowances and estimates. An allowance is not necessarily the final cost.
  3. Resolve blanks before choosing. Ask for written clarification rather than assuming missing work is included.

Use the worksheet: print this page or choose Save as PDF in your browser's print menu, then fill it in. No email or account is needed. The printed version contains only the worksheet.

Your Three-Bid Comparison

Project: __________________________   Plans / scope version: __________________

Date: __________________________   Location: ______________________________

On a small screen, swipe across the table to see all three bids.

Record amounts, inclusions, and open questions for each bid.
CompareBid ABid BBid C
Business / license number
CSLB checked on / concerns
Total / fixed or estimated
Scope / quantities / materials
Allowances / unit prices
Design / engineering / permits
Site work / utilities / disposal
Exclusions / owner responsibilities
Deposit / payment milestones
Timing / inspection responsibilities
Change-order process / warranty
References / unresolved questions

Ask bidders to confirm missing items in writing. A blank cell does not mean included or free. ContractorLicenseCA.com · September 19, 2026 · Comparison aid, not a contract.

Example: Why the Lowest Number May Not Be Cheapest

Suppose Bid A is $30,000 but excludes $4,000 of work already included in Bid B's $33,000 total. Once the scope matches, A is $34,000. This is an illustrative comparison, not a California market-price estimate. Unknown costs should stay marked unknown until the bidder confirms them.

Comparing upfront payments? The California contractor deposit calculator checks the ordinary home-improvement limit. Review its exceptions alongside each bidder's written payment schedule.

For an ADU or Garage Conversion

Use our California ADU contractor hiring guide for a project-specific question list.

Ask separately about design, engineering, surveys or soil studies, utility connections and upgrades, site access, foundation work, and agency fees. Confirm who handles permits and inspections, and whether the bid uses approved plans or preliminary assumptions. A detached ADU and a garage conversion can involve very different work; compare bids for the same project.

Use your local planning department and the California HCD ADU handbook to check requirements for your property. A contractor's license alone does not establish ADU experience or guarantee permit approval.

Planning a home project?

Find local pros. Continue on Angi to describe your project and request quotes.

Compare quotes on Angi → Affiliate partner. We may earn a commission.

Created September 19, 2026. Worksheet developed for this site. CSLB recommends comparing bids using the same plans and specifications: finding the right contractor.

Browse the Directory

Popular Classifications

Top Cities